Site C Dam – Used Power

Project Name

Site C Dam  –  Used Power

Client

Site C Dam

PowerSafe’s Scope of work

3.5MW/600V  of Used CAT Power Generation – 2 weeks delivery

8.0MVA 25kV:600V of Used Power Transformers – 4 weeks delivery

Project Overview

The Site C Dam is an early-stage project of BC Hydro for a large-scale earth fill hydroelectric dam on the Peace River near Fort St. John in northeastern British Columbia, Canada.[1] The site is downstream from the existing W.A.C. Bennett and Peace Canyon dams. Designs call for an estimated peak capacity of approximately 1,100 MW, average output of 900 MW, and an annual output of 5,100 GWh of electricity.[2] When completed, Site C will be the first large dam built in BC since 1984 and BC’s fourth largest producer of electricity