The Site C Dam, a BC Hydro project for a large-scale earth fill hydroelectric dam on the Peace River near Fort St. John in northeastern British Columbia, Canada.[1] The site is downstream from the existing W.A.C. Bennett and Peace Canyon dams. Designs call for an estimated peak capacity of approximately 1,100 MW, average output of 900 MW, and an annual output of 5,100 GWh of electricity.[2] When completed, Site C will be the first large dam built in BC since 1984 and BC’s fourth largest producer of electricity
PowerSafe provided 3.5MW/600V of Used CAT Diesel Power Generation in 500kW and 1000kW power modules for construction back up power with rapid deployment in under 2 weeks delivery
Additionally, PowerSafe supplied 8.0MVA – 25kV Primary : 600V Secondary of Used & Refurbed Power Transformers with a rapid deployment of 4 weeks delivery